Projects Affecting You

uptown waterloo grist mill

Contact

Main Office
526 Country Squire Rd.
P.O. Box 640
Waterloo, ON
N2J 4A3

Phone: 519-886-5090
Fax: 519-746-0133


When it comes to electricity, Waterloo North Hydro has an excellent safety record.

Our very thorough on-going maintenance program and long-term planning efforts allow us to anticipate and prepare for increased customer demand, new technologies, and required upgrades.

When planning our maintenance and upgrade projects, we are careful to ensure that disruptions to local communities are kept to a minimum.

Here are some projects that might affect you:

City of Waterloo

Township of Wellesley

Township of Woolwich

Completed Projects


 

City of Waterloo

Beaver Creek Road, Conservation Dr to River Crossing

  • Relocation of poles due to City of Waterloo road improvement  project
  • Design/Construction 2018

 

Bridge Street West, University Ave E to Bridle Trail

  • Relocation of poles due to Region of Waterloo road work project & renewing existing overhead distribution system
  • Design completed
  • Construction 2018

 

Marsland Dr, Columbia St to University Ave

  • Renew Existing Overhead Distribution System  
  • Design/Construction 2018

 

Northfield Drive West, Westmount Rd to Weber St

  • Renew Existing Overhead Distribution System  
  • Design 2016
  • Construction 2018

 

Northfield Dr, Davenport Rd to Bridge St

  • Renew Existing Overhead Distribution System  
  • Construction 2018

 

Union Street - King St to Weber St

  • Renew Existing Overhead Distribution System  
  • Design 2017
  • Construction 2019

 

Vermont St (Back lot)

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Weber Street, Forwell Creek to Blythwood Rd

  • Renew Existing Overhead Distribution System
  • Design 2017
  • Construction 2018

Woodington Pl

  • Renew Existing Overhead Distribution System
  • Design/Construction 2018

 

 

Back to Top


  

Township of Wellesley

Buehler Line – Manser Rd to Road 116 

  • Renew Existing Overhead Distribution System
  • Design/Construction 2018

 

Deborah Glaister Line – Manser Rd to Lichty Rd – Phase 2

  • Renew Existing Overhead Distribution System
  • Design 2017
  • Construction 2018

 

Nafziger Road - Gerber Rd to Queen's Bush Rd, through Town of Wellesley

  • Renew Existing Overhead Distribution System
  • Design/Construction 2019

 

Wilker Way, Ament Line to Pine St, Linwood

  • Renew Existing Overhead Distribution System
  • Construction 2018

 Back to Top


 

Township of Woolwich

Birdland Area Plan Development - Elmira

Project boundaries: Chickadee Court, Canary Court, Cedar Waxwing Drive from Barnswallow Drive to Flamingo Drive, Flamingo Drive from First Street to Oriole Parkway, Grosbeak Road from Cedar Waxwing Drive to Oriole Parkway, Kingfisher Drive  from Barnswallow Drive to Grosbeak Road, Thrust Court, Phoebe Crescent, Oriole Parkway West from Grosbeak Road to Flamingo Road.

  • Renew existing underground distribution system
  • Design complete
  • Construction in progress 2015
  • Area Plan Development Complete Letter

 

Birdland North Area Plan Development – Still being constructed

Project boundaries: First Street to the South, Barnswallow to the West, Snyder Ave to the East of creek, to the North.

  • Renew existing overhead distribution system
  • Construction 2017/2018
  • Area Plan Development Commencement

Birdland Development

  • Renew existing overhead distribution system
  • Design 2017 and 2018
  • Construction 2017 and 2018
  • Date Jun 27, 2017 Open House Materials
  • Design & Construction in progress - Area Map
    • Area 1 – First St overhead and underground distribution, Snyder to St Theresa of Avila Catholic  School, complete
    • Area 2 -  Bluebird and Bluejay underground distribution, complete
    • Area 3 -  First St and Second St backlot overhead secondary line, complete
    • Area 4 -  Killdeer Rd underground distribution, in spring 2018
    • Area 5 -  First St from Robin to Barnswallow, in spring 2018
    • Area 6 -  Aspen Cres underground distribution, spring or summer 2018

 

Ament Line and Herrgott Rd – Roundabout

  • Construction 2018

 

Arthur Street North – Martins Lane to Riverside Dr E

  • Renew Existing Overhead Distribution System
  • Design 2017
  • Construction 2018

 

Arthur St and Memorial Ave, Arthur St S and Walker St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

 Brubacher St – Snyder Ave S to Arthur St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Center St, Mill St to Bauman St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Church Street West – Snyder Ave N to Maple St

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Design 2017
  • Construction 2018

 

Cross Street rear lot – Church St to Riverside Dr E

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Design 2017
  • Construction 2018

 

Duke St, Church St to Union St

  • Renew Existing Overhead Distribution System

Construction 2018

 

Dunke Street North – Church St N to William St – Add 2 Phases

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Design 2017
  • Construction 2018

 

Fountain St – South of Breslau to Menno St

  • 27.6 kV conversion
  • Construction 2018

 

Greenhouse Rd – Victoria St to Kramp Rd

  • New Overhead Distribution System
  • Construction 2018

 

James St and Hampton St (Rear lot)

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

James St – Snyder Ave S to Arthur St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Maple Bend Rd, Durant Rd to FC 6123, Maple Bend Rd to Sawmill Rd to FC 6123

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Construction 2018

 

Memorial Ave and Queen St (Rear lot)

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Mill St – Duke St to Memorial Ave, Memorial Ave, Church St E to Mill St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Park St, Arthur St to Union St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Queen St, First St E to Bauman St, Bauman St, Memorial St to Duke St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Sawmill Rd, Snyder Flats to River St, Bloomingdale

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Sawmill Rd (RR 17) and Katherine St (RR 23) Roundabout

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

South St, Arthur St to Union St

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Victoria St – Woolwich-Guelph Townline

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Victoria St – Fountain St to Shantz Station Rd

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Weigel Ave North and South (Rear lot)

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

William Street rear lot – Snyder Ave to Maple St

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Design 2017
  • Construction 2018

 

Woolwich-Guelph Townline – Chilligo Rd to Victoria St N

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Wyatt St to University Ave (Rear lot)

  • Renew Existing Overhead Distribution System
  • Construction 2018

 

Snyder Ave N South of William

  • Renew Existing Overhead Distribution System (Pole Line Rebuild)
  • Design 2017
  • Construction 2018

 

Back to Top

________________________________________________________________

Completed Projects

 City of Waterloo 

Westmount Area Plan Development

  • Renew existing overhead distribution system
  • Design 2013 and 2014
  • Construction 2013 and 2014
  • September 11, 2013 Open House Materials
    • Introduction
    • This is what we've learned
    • The work we need to undertake
    • Options we considered
    • Input we received from the open house
    • Next steps
    • Open House Update Letter
  • Design & Construction in progress - Area Map
    • Area 1 - complete
    • Area 2 - Spring 2014
    • Area 3 - Spring 2014
    • Area 4 - Spring 2014
    • Area 5 - Spring 2014
    • Area 6 - does not require upgrades at this time.
    • John St and Forsyth Dr (West of Stanley Dr) underground conduit installation - Fall 2014

Alvin and MacKay Area Plan Development

 Uptown West Area Plan Development

 