Poolsaver Program

Child in swimming in pool

Contact

A refreshing upgrade that saves!

Most constant-speed swimming pool pumps run 24/7, often at a higher speed than necessary for the task. That's a big opportunity to save electricity! Get a $400 rebate when you replace a constant-speed pool pump with a variable-speed pump with the Poolsaver program.  The rebate will be applied at the time of purchase.  Pump must be purchased from and installed by a participating dealer.


 

Save on the ticket price and on electricity costs year after year

Less electricity icon

Use up to 90% less electricity

A variable-speed pump runs at a fraction of the speed, using only the electricity needed for the job.
Quick payback icon

Quick payback

With rebates and ongoing electricity savings, it can pay for itself in just 2-3 years.

 Quieter operation icon

Quieter operation

Near-silent performance will keep your poolside peaceful.

 Longer lasting icon

Lasts longer

Not running a pump at full speed, 24/7 will help keep equipment lasting longer.

 Environmentally-friendly icon

More environmentally-friendly

Upgrading is an easy way to reduce your carbon footprint.

 


Cost Comparison


Eligibility

To qualify, participants must:

  • be a single-family residential customer of Waterloo North Hydro;
  • own an inground swimming pool with a constant-speed pool pump motor;
  • purchase a qualifying variable-speed pool pump from a participating pool pump Vendor;
  • have the variable-speed pool pump installed by the participating Vendor or the Vendor's contracted installer.

    Offer subject to terms and conditions


Participating Vendors

For a list of participating vendors please visit Find a Vendor on the Poolsaver Program webpage.

 


 

Want to Become a Participating Vendor? 

Please visit the Poolsaver program website for more information on how to become a qualified Poolsaver rebate vendor.

 

Subject to additional terms and conditions found at saveonenergy.ca. *Incentives are available for installation of eligible equipment completed between January 1 and December 31, 2018 and submitted no later than Feb. 1, 2019. Equipment must be purchased from and installed by a participating contractor. Save on Energy is powered by the Independent Electricity System Operator and brought to you by Waterloo North Hydro Inc. OM Official Mark of the Independent Electricity System Operator. Used under licence.