When it comes to electricity, Waterloo North Hydro has an excellent safety record.
Our very thorough on-going maintenance program and long-term planning efforts allow us to anticipate and prepare for increased customer demand, new technologies, and required upgrades.
When planning our maintenance and upgrade projects, we are careful to ensure that disruptions to local communities are kept to a minimum.
Here are some projects that might affect you:
City of Waterloo
Township of Wellesley
Township of Woolwich
Completed Projects
City of Waterloo
Overhead:
Bluevale St – Bridgeport Rd to Mayfield Ave
- Overhead Pole Line Rebuild
- Construction summer 2021
Weber Street, Blythwood Road to Parkside Drive
- Overhead Pole Relocation for Regional Road Widening
- Design 2019
- Construction underway
Kumpf Dr, Northfield Dr to Randall
- Overhead Pole Line Rebuild
- Construction Summer/fall 2021
Randall Dr/Conrad Pl
- Overhead Pole Line Rebuild
- Construction Spring 2021
Bridge St – University Ave to Lexington
- Overhead Pole Line Rebuild
- Construction summer/fall 2021
Quiet Place
- Relocate hydro poles
- Design 2020
- Construction spring 2021
Union St – King St to Moore Ave
- Relocate hydro poles
- Design 2021
- Construction summer 2021
Underground:
Northlake Subdivision (Morningdale Cres, Wintergreen Dr, Deerberry Pl and Clearwater Cres)
- Underground cable replacement, transformer replacement
- Design Complete
- Construction Underway
Roosevelt Ave (Warrington to Erb)
- Replace end of life submersible transformers
- Design Complete
- Construction Winter-Spring 2021
Northlake Subdivision (Cornerbrook Cres, Cornerbrook Pl)
- Underground cable replacement, transformer replacement
- Design in Progress
- Construction Summer 2021
Back to Top
Township of Wellesley
Overhead:
Nafziger Road, Gerber Road to Queen's Bush Road, through Town of Wellesley
- Renew Existing Overhead Distribution System
- Design Summer 2020
- Construction underway
William Hastings Line – Manser Rd to Road 116
- Renew Existing Overhead Distribution System
- Design Construction underway
Queens Bush Road – Hutchison Road to Nafziger Road
- Renew Existing Overhead Distribution System
- Design completed
- Construction underway
Boomer Line – Herrgott to Kressler
- Pole replacement
- Design 2021
- Construction spring/summer 2021
Back to Top
Township of Woolwich
Overhead:
Downtown Maryhill – Maryhill Road and St Charles St
- Renew existing Overhead Distribution System
- Design in progress
- Construction Spring 2021
Maryhill Road, Homestead Dr to Crowsfoot Rd
- Renew Existing Overhead Distribution System
- Design in progress
- Construction summer 202
Village View Road, Maryhill Road to Woolwich-Guelph Townline
- Renew Existing Overhead Distribution System
- Design in progress
- Construction underway
Katherine St – Lundy to Crowsfoot
- Pole line rebuild
- Design 2021
- Construction spring/summer 2021
Lerch Road
- Pole line rebuild
- Design 2020
- Construction winter/spring 2021
Floradale Road – Arthur St to Cedar Spring Rd
- Pole line rebuild
- Design 2021
- Construction spring 2021
Church St – Spruce Ln to Arthur St
- Pole line rebuild
- Design 2020/2021
- Construction summer 2021
Sawmill Rd – Golf Course Rd to Katherine St
- Pole line rebuild
- Design 2021
- Construction fall 2021
Underground:
Golf Course Road Subdivision
- Underground cable and Transformer replacement
- Design Winter 2020 to Spring 2021
- Construction Summer/Fall 2021
Back to Top
________________________________________________________________
Completed Projects
City of Waterloo
Westmount Area Plan Development
- Renew existing overhead distribution system
- Design 2013 and 2014
- Construction 2013 and 2014
- September 11, 2013 Open House Materials
- Design & Construction in progress - Area Map
- Area 1 - complete
- Area 2 - Spring 2014
- Area 3 - Spring 2014
- Area 4 - Spring 2014
- Area 5 - Spring 2014
- Area 6 - does not require upgrades at this time.
- John St and Forsyth Dr (West of Stanley Dr) underground conduit installation - Fall 2014
Alvin and MacKay Area Plan Development
Uptown West Area Plan Development
- Renew existing distribution system
- Plan development completion expected Fall 2014
- October 29, 2012 Open House Materials
- Open House Update Letter
Township of Woolwich
Birdland Area Plan Development - Elmira
Project boundaries: Chickadee Court, Canary Court, Cedar Waxwing Drive from Barnswallow Drive to Flamingo Drive, Flamingo Drive from First Street to Oriole Parkway, Grosbeak Road from Cedar Waxwing Drive to Oriole Parkway, Kingfisher Drive from Barnswallow Drive to Grosbeak Road, Thrust Court, Phoebe Crescent, Oriole Parkway West from Grosbeak Road to Flamingo Road.
- Renew existing underground distribution system
- Design complete
- Construction in progress 2015
- Area Plan Development Complete Letter
Birdland North Area Plan Development
Project boundaries: First Street to the South, Barnswallow to the West, Snyder Ave to the East of creek, to the North.
- Renew existing overhead distribution system
- Area Plan Development Commencement
- Date Jun 27, 2017 Open House Materials
- Design 2017 and 2018
- Construction 2017 and 2018
- Design & Construction in progress - Area Map
- Area 1 – First St overhead and underground distribution, Snyder to St Theresa of Avila Catholic School, complete
- Area 2 - Bluebird and Bluejay underground distribution, complete
- Area 3 - First St and Second St backlot overhead secondary line, complete
- Area 4 - Killdeer Rd underground distribution, Spring 2018
- Area 5 - First St from Robin to Barnswallow, Spring 2018
- Area 6 - Aspen Cres underground distribution, Summer 2018