When it comes to electricity, Waterloo North Hydro has an excellent safety record.

Our very thorough on-going maintenance program and long-term planning efforts allow us to anticipate and prepare for increased customer demand, new technologies, and required upgrades.

When planning our maintenance and upgrade projects, we are careful to ensure that disruptions to local communities are kept to a minimum.

Here are some projects that might affect you:

City of Waterloo

Township of Wellesley

Township of Woolwich

Completed Projects


 

City of Waterloo

Beaver Creek Road, Conservation Drive to River Crossing

  • Overhead Pole Relocation for City Road re-development
  • Design 2019
  • Construction winter 2020 

 

Butternut Ave and Royal Fern St (Columbia Forest Subdivision)

  • Complete single phase loop
  • Design 2019
  • Construction spring 2019

 

Erb Street, Fischer Hallman Road to Erbsville Court

  • Overhead Pole Relocation for Regional Road Widening
  • Design 2019
  • Construction in progress

 

King St. Road Crossings (Young/Central St.)

  • Design in progress
  • Construction in 2019

 

Moccasin Dr, Greenbrier Dr & Longwood Dr

  • Replace submersible transformers
  • Design 2018
  • Construction spring 2019

 

Northlake Subdivision (Skylark Rd - Northlake Dr - Golden Eagle Rd)

  • Underground cable replacement
  • Design 2018
  • Construction summer-fall 2019

 

Silverbirch Rd

  • Replace submersible transformers
  • Design 2018
  • Construction spring 2019

 

Vermont St (Back lot)

  • Renew Existing underground Distribution System
  • Design complete
  • Construction 2019

 

Weber Street, Blythwood Road to Parkside Drive

  • Overhead Pole Relocation for Regional Road Widening
  • Design 2019
  • Construction winter & fall 2020

 

Wild Ginger Ave and White Birch Ave (Vista Hill Subdivision)

  • Replace submersible transformers
  • Design 2018
  • Construction spring-summer 2019

 

 

 Back to Top


  

Township of Wellesley

Deborah Glaister Road– Chalmers Forrest Road to Road 116

  • Renew Existing Overhead Distribution System 
  • Design complete
  • Construction in progress
     

Gerber Road

  • New Subdivision
  • Design complete
  • Construction Winter 2018/Spring 2019

 

Hutchison Road – Weimar Line to Queens Bush Rd

  • Renew Existing Overhead Distribution System 
  • Design/Construction winter 2020

 

Hutchison Road – Streicher Line to William Hastings Line

  • Renew Existing Overhead Distribution System 
  • Design Completed
  • Construction winter 2020

 

Manser Road – Ament Line to William Hastings Line

  • Renew Existing Overhead Distribution System 
  • Design Completed
  • Construction winter/spring 2020

 

Nafziger Road, Gerber Road to Queen's Bush Road, through Town of Wellesley

  • Renew Existing Overhead Distribution System
  • Design/Construction 2020

 

William Hastings Line – Hutchison Road to Road 116

  • Renew Existing Overhead Distribution System 
  • Design/Construction spring/summer 2020

 

Queens Bush Road – Hutchison Road to Nafziger Road

  • Renew Existing Overhead Distribution System 
  • Design/Construction spring/summer 2020

 

 Back to Top


 

Township of Woolwich

Hawkesville Rd – Northside Drive to Railway Tracks

  • Renew Existing Overhead Distribution System
  • Design complete
  • Construction in progress

 

Herrgott Road, Boomer Line to Sunset Drive

  • Renew Existing Overhead Distribution System
  • Design complete
  • Construction winter 2020

 

Maryhill Road/Cox Creek Road, Boomer Line to Sunset Drive

  • Renew Existing Overhead Distribution System
  • Design/construction 2020

 

Village View Road, Maryhill Road to Woolwich-Guelph Townline

  • Renew Existing Overhead Distribution System
  • Design/construction 2020

 

Spitzig Rd – Hopewell Creek Rd to St. Charles St.

  • Renew Existing Overhead Distribution System
  • Design complete
  • Construction winter/spring 2020

Back to Top

________________________________________________________________

Completed Projects

 City of Waterloo 

Westmount Area Plan Development

Alvin and MacKay Area Plan Development

 Uptown West Area Plan Development

 Township of Woolwich

Birdland Area Plan Development - Elmira

Project boundaries: Chickadee Court, Canary Court, Cedar Waxwing Drive from Barnswallow Drive to Flamingo Drive, Flamingo Drive from First Street to Oriole Parkway, Grosbeak Road from Cedar Waxwing Drive to Oriole Parkway, Kingfisher Drive  from Barnswallow Drive to Grosbeak Road, Thrust Court, Phoebe Crescent, Oriole Parkway West from Grosbeak Road to Flamingo Road.

  • Renew existing underground distribution system
  • Design complete
  • Construction in progress 2015
  • Area Plan Development Complete Letter

 

Birdland North Area Plan Development 

Project boundaries: First Street to the South, Barnswallow to the West, Snyder Ave to the East of creek, to the North.

  • Renew existing overhead distribution system
  • Area Plan Development Commencement
  • Date Jun 27, 2017 Open House Materials
  • Design 2017 and 2018
  • Construction 2017 and 2018
  • Design & Construction in progress - Area Map
    • Area 1 – First St overhead and underground distribution, Snyder to St Theresa of Avila Catholic  School, complete
    • Area 2 -  Bluebird and Bluejay underground distribution, complete
    • Area 3 -  First St and Second St backlot overhead secondary line, complete
    • Area 4 -  Killdeer Rd underground distribution, Spring 2018
    • Area 5 -  First St from Robin to Barnswallow, Spring 2018
    • Area 6 -  Aspen Cres underground distribution, Summer 2018

 