When it comes to electricity, Waterloo North Hydro has an excellent safety record.

Our very thorough on-going maintenance program and long-term planning efforts allow us to anticipate and prepare for increased customer demand, new technologies, and required upgrades.

When planning our maintenance and upgrade projects, we are careful to ensure that disruptions to local communities are kept to a minimum.

Here are some projects that might affect you:

City of Waterloo

Township of Wellesley

Township of Woolwich

Completed Projects


 

City of Waterloo

Beaver Creek Road, Conservation Dr to River Crossing

  • Renew Existing Overhead Distribution System 
  • Design/Construction 2020

 

Butternut Ave and Royal Fern St (Columbia Forest Subdivision)

  • Complete single phase loop
  • Design 2019
  • Construction spring 2019

 

Conestogo Rd, King St to Bauer Pl

  • Renew Existing Overhead Distribution System 
  • Design Complete
  • Construction in Progress

 

Erb Street, Fischer Hallman Road to Erbsville Court

  • Renew Existing Overhead Distribution System 
  • Design/Construction 2019

 

King St. Road Crossings (Young/Central St.)

  • Design in progress
  • Construction in 2019

 

Marsland Dr, Columbia St to University Ave

  • Renew Existing Overhead Distribution System  
  • Design complete
  • In construction

 

Moccasin Dr, Greenbrier Dr & Longwood Dr

  • Replace submersible transformers
  • Design 2018
  • Construction spring 2019

 

Northlake Subdivision (Skylark Rd - Northlake Dr - Golden Eagle Rd)

  • Underground cable replacement
  • Design 2018
  • Construction summer-fall 2019

 

Silverbirch Rd

  • Replace submersible transformers
  • Design 2018
  • Construction spring 2019
     

Vermont St (Back lot)

  • Renew Existing underground Distribution System
  • Design complete
  • Construction 2019

 

Wild Ginger Ave and White Birch Ave (Vista Hill Subdivision)

  • Replace submersible transformers
  • Design 2018
  • Construction spring-summer 2019

 

 Back to Top


  

Township of Wellesley

Deborah Glaister Road– Chalmers Forrest Road to Road 116

  • Renew Existing Overhead Distribution System 
  • Design in Progress
  • Construction in 2019

 
Gerber Road

  • New Subdivision
  • Design complete
  • Construction Winter 2018/Spring 2019
     

Hutchison Road – Weimar Line to Streicher Line

  • Renew Existing Overhead Distribution System 
  • Design Completed
  • Construction in Progress

Nafziger Road, Gerber Rd to Queen's Bush Rd, through Town of Wellesley

Renew Existing Overhead Distribution System

  • Design/Construction 2020

 

Road 116 - Deborah Glaister Road to Perth Line

  • Renew Existing Overhead Distribution System 
  • Design in Progress
  • Construction in 2019

 

Streicher Line – Road 116 to Hutchison Road

  • Renew Existing Overhead Distribution System 
  • Design Completed
  • Construction in Progress

 

 Back to Top


 

Township of Woolwich

Arthur Street North, Martin’s Lane to Riverside Dr E

  • Renew Existing Overhead Distribution System
  • Design 2017
  • Construction 2018
     

Arthur St and Memorial Ave, Arthur St S and Walker St

  • Renew Existing Overhead Distribution System
  • Design in complete
  • Construction 2018
     

Cross Street rear lot, Church St to Riverside Dr E

  • Renew Existing Overhead Distribution System
  • Design 2017
  • Construction 2019
     

Crowsfoot Rd, Halm Rd to Durant Rd

  • Renew Existing Overhead Distribution System
  • Design in Progress
  • Construction in 2019
     

Duke St, Church St to Union St

  • Renew Existing Overhead Distribution System
  • Design complete
  • Construction 2019
     

Fountain St, Kossuth Rd to Menno St

  • 27.6 kV conversion
  • Design complete
  • Construction 2019
     

Greenhouse Rd – Victoria St to Kramp Rd

  • New Overhead Distribution System
  • Design complete
  • Construction 2018
     

Howard Ave, Union St to Industrial Dr

  • 27.6 kV conversion
  • Design complete
  • Construction 2019
     

Memorial Ave, Queen St, Park Ave to Wyatt St

  • Renew Existing Overhead Distribution System
  • Design complete
  • In progress
     

Oriole Parkway, Union St to Industrial Dr

  • 27.6 kV conversion
  • Design in Progress
  • Construction 2019 

 

Park St, Arthur St to Union St

  • Renew Existing Overhead Distribution System
  • Design complete
  • In progress

 

Second St from Snyder to Arthur

  • Conversion to 4 kV
  • Design complete
  • Construction Spring 2019
     

Second St

  • Backlot secondary provisions for front lot secondary
  • Design 2018
  • Construction winter 2019
     

South St, Arthur St to Union St

  • Renew Existing Overhead Distribution System
  • Design complete
  • Construction 2019

Union St - Park Ave to Oriole Parkway

  • Design 2019
  • Construction 2019
     

Victoria St – Fountain St to Shantz Station Rd

  • Renew Existing Overhead Distribution System
  • Design complete
  • In progress 

Back to Top

________________________________________________________________

Completed Projects

 City of Waterloo 

Westmount Area Plan Development

Alvin and MacKay Area Plan Development

 Uptown West Area Plan Development

 Township of Woolwich

Birdland Area Plan Development - Elmira

Project boundaries: Chickadee Court, Canary Court, Cedar Waxwing Drive from Barnswallow Drive to Flamingo Drive, Flamingo Drive from First Street to Oriole Parkway, Grosbeak Road from Cedar Waxwing Drive to Oriole Parkway, Kingfisher Drive  from Barnswallow Drive to Grosbeak Road, Thrust Court, Phoebe Crescent, Oriole Parkway West from Grosbeak Road to Flamingo Road.

  • Renew existing underground distribution system
  • Design complete
  • Construction in progress 2015
  • Area Plan Development Complete Letter

 

Birdland North Area Plan Development 

Project boundaries: First Street to the South, Barnswallow to the West, Snyder Ave to the East of creek, to the North.

  • Renew existing overhead distribution system
  • Area Plan Development Commencement
  • Date Jun 27, 2017 Open House Materials
  • Design 2017 and 2018
  • Construction 2017 and 2018
  • Design & Construction in progress - Area Map
    • Area 1 – First St overhead and underground distribution, Snyder to St Theresa of Avila Catholic  School, complete
    • Area 2 -  Bluebird and Bluejay underground distribution, complete
    • Area 3 -  First St and Second St backlot overhead secondary line, complete
    • Area 4 -  Killdeer Rd underground distribution, Spring 2018
    • Area 5 -  First St from Robin to Barnswallow, Spring 2018
    • Area 6 -  Aspen Cres underground distribution, Summer 2018

 

Back to Top

>